Comparison · Sectors

Warehouse vs factory solar: how the two compare

The short answer: factories tend to pay back faster because they use more power in daylight, while warehouses have bigger, simpler roofs that are cheaper to build on. For both, the right system size comes from your half-hourly data.

At a glance

WarehouseFactory
Demand in daylightModerate: lighting, conveyors, chargingHigh: machinery, compressed air, process heat
RoofLarge, open, modern portal frameVaried age and type; more plant and rooflights
Sizing approachSize to demand, not roof areaOften limited by roof or grid before demand
Indicative payback*About 3.5 to 4.5 yearsAbout 3 to 4 years (multi-shift)
Common add-onsEV and forklift charging, batteryBattery for weekends, power monitoring
Check firstLease length and landlord consentRoof structure and G99 capacity

*Indicative pre-tax ranges from our ROI and payback guide. Not a quote.

Where warehouses win

Large, clear roofs mean fewer design compromises and a lower cost per kWp. Distribution sites that add electric vehicles or forklift charging can use much more of the output. Tenants should check their lease first; see solar panels for warehouses and the warehouses and logistics page.

Where factories win

Heavy daytime demand means most units replace electricity you would otherwise buy. The limits tend to be the roof and the grid connection, so book a structural survey and check G99 capacity early. See solar panels for factories and the factories and manufacturing page.

Also compare

Warehouse or factory, start with your data

Run the calculator for a quick figure, then send 12 months of half-hourly data for a free feasibility review sized to how your site really uses power.

Frequently asked questions

Is solar better for a warehouse or a factory?

A multi-shift factory usually gets a faster payback, because it uses more of the power generated. A warehouse usually has a cheaper, simpler roof to build on. The better choice for any site depends on how much electricity it uses in daylight hours.

How should a warehouse size its solar system?

Size it to your daytime demand, using half-hourly data, rather than to the size of the roof. You can add capacity later if you install EV or forklift charging or a battery.

What roof issues are common on factories?

Older factory roofs can be fragile, contain asbestos-cement sheets, or be crowded with plant and rooflights. A structural survey is needed before design.

Does shift pattern matter?

Yes. A single-shift site uses less solar at weekends and early evenings, while two or three shifts keep demand high through daylight. Weekend shutdowns are a good reason to look at battery storage or export terms.

Who needs DNO approval?

Both, for larger systems. Factories more often run into export limits because their systems are large and their connections may already be heavily used.

Free feasibility review

Request your free feasibility review

Share a few details and our team will send a no-obligation review of your site - indicative system size, annual generation, savings and payback. Prefer to explore numbers yourself first? Run the calculator or contact us directly.

  • MCS & RECC accredited installer
  • Response within one working day
  • No cost, no obligation
Try the calculator

By submitting you agree to be contacted about your enquiry. We don't share your details.

Ready to see whether your roof could reduce your energy bills?