The short answer: industrial sites are often among the best fits for solar, because they have large roofs or land and use most of their electricity during the day. The main planning points are the grid connection, roof structure and how the project is funded.

What counts as industrial solar?

Industrial solar panels are large solar PV systems built for factories, processing plants, depots and other energy-intensive sites. The panels themselves are standard commercial modules (see our best commercial solar panels guide); the difference is scale, electrical design and the checks needed on structure, grid and safety.

System sizeTypical siteWhat to expect
100-250 kWpSingle factory unit, food processor, large workshopOften fits on one roof; G99 usually needed.
250 kWp-1 MWpManufacturing plant, distribution centre, multi-unit siteGrid capacity and export limits become a key design factor.
1 MWp+Heavy industry, campus sites, roof plus ground arraysDetailed DNO study, possible grid upgrades and longer lead times.

What makes an industrial solar project different

Daytime demand

Continuous processes, compressors, refrigeration and machinery use power while the sun is up, so more solar output is used on site.

Grid connection

Large arrays need a G99 application. Your DNO may cap export, which favours sizing the system to your own use or adding battery storage.

Roof structure and safety

Industrial roofs need a structural check for extra load, fragile areas and access. Asbestos-cement sheeting needs specialist assessment.

Fire and insurance

Insurers will want to know about the system design, isolation and maintenance. Tell your insurer early.

Space options

If the roof is limited, consider ground-mounted arrays on spare land or solar carports over staff and lorry parking.

Funding

Large projects can be bought outright, financed, or delivered through an on-site PPA with no capital outlay.

How much do industrial solar panels cost in the UK?

Industrial systems are priced per kWp, and the cost per kWp generally falls as the system gets larger because design, scaffolding and connection costs are spread over more panels. The biggest swings come from things outside the panels: roof repairs or over-cladding, access, grid upgrades, and whether you add batteries.

For indicative UK price ranges by system size, see our commercial solar panels cost guide and the UK commercial solar benchmarks. Payback depends mainly on how much output you use on site and what you pay per kWh; our ROI and payback guide includes worked, indicative examples for manufacturing, warehousing and cold storage. All figures are indicative and not a quote.

Is your industrial roof suitable?

Most industrial roofs are steel profile sheeting, which is usually well suited to solar with rail or clamp-on fixings. Before design, a structural survey checks the extra load, purlin condition, wind uplift and remaining roof life. If the roof will need replacing within the life of the system (25+ years), it is usually cheaper to do it first.

Older buildings may have asbestos-cement or fragile roof sheets. These need specialist assessment and safe working methods, and may need over-cladding or replacement before panels go on. Fire safety is also a priority on large sites: plan isolation, cable routes and access with your installer, and read our fire safety and insurance guides before you talk to your insurer.

Roof, ground or carport?

Most industrial projects start with the roof, because it is space you already own. Where the roof is fragile, shaded or near the end of its life, a ground-mounted system or solar carport can work instead. Our rooftop vs ground-mounted comparison sets out the trade-offs.

Getting the grid connection right

Larger systems need DNO approval under G99. The DNO may limit how much you can export, ask for protection equipment or quote for network upgrades, and in some areas connection offers can take months. Apply early and size the system around your own use. Read our G99 connection guide and consider battery storage to use more of your own output.

Planning permission for industrial solar

In England, many rooftop systems on non-domestic buildings can go ahead under permitted development, subject to conditions. Listed buildings, conservation areas, and most ground-mounted arrays usually need an application, and the rules differ across the UK nations. See our planning permission guide for the details.

Batteries, shift patterns and 24/7 sites

Sites running a single day shift use most solar output directly. Sites with evening shifts, weekend shutdowns or an export cap can store surplus midday output in batteries and use it later, or to reduce peak demand charges. Batteries add cost, so they are worth modelling with your half-hourly data rather than assuming they will pay back.

Funding an industrial solar project

You can buy outright (highest savings, capital needed), use asset finance or a loan, lease the system, or sign an on-site PPA where a funder installs and owns the panels and you buy the power at an agreed rate, with £0 upfront. Compare the options in our commercial solar finance guide and PPA guide.

Which industrial sectors suit solar best?

Comparing site types? See warehouse vs factory vs cold storage solar and our solar panels for factories guide.

How to start an industrial solar project

  1. Collect 12 months of half-hourly data and bills (how to get your data).
  2. Get a quick estimate from the solar savings calculator.
  3. Check the roof or land with a structural survey.
  4. Check grid capacity and start the G99 application.
  5. Compare funding: buy, finance or an on-site PPA.
  6. Request a free feasibility review to size the system and model payback.

Planning solar for an industrial site?

A free feasibility review checks your demand profile, roof or land, grid connection and funding options, so you know whether a large system is worth taking forward.

Frequently asked questions

What are industrial solar panels?

They are the same high-output solar modules used on commercial buildings, installed at larger scale on factories, processing plants, depots and industrial land. What changes is the system design: larger inverters, a bigger grid connection and closer attention to roof structure, fire safety and insurance.

How much do industrial solar panels cost in the UK?

As a rough guide, large rooftop systems are usually priced per kWp and the cost per kWp tends to fall as systems get bigger. Roof repairs, scaffolding, grid upgrades and battery storage can add significantly. Figures on this page are indicative only; a feasibility review gives a site-specific estimate.

Is solar worth it for heavy industry?

Often, because industrial sites typically use a lot of electricity during daylight hours, so most of the solar output can be used on site rather than exported. The return depends on your demand profile, tariff, roof or land and grid connection.

What size solar system does an industrial site need?

Most industrial systems range from around 100 kWp to several MWp. The right size is usually set by your daytime electricity use and any export limit from your DNO, not just by roof area. Half-hourly data shows how much you can use on site.

Do industrial solar systems need DNO approval?

Yes. Larger systems normally need an application to your Distribution Network Operator under the G99 process before connection, and the DNO may limit export or require upgrades. Start this early, as it can affect timescales.

Do I need planning permission for industrial solar panels?

Many rooftop systems on non-domestic buildings fall under permitted development in England, subject to conditions and limits, but listed buildings, conservation areas and ground-mounted arrays often need permission. Rules differ in Scotland, Wales and Northern Ireland, so check before committing.

Can solar go on an old or asbestos industrial roof?

Sometimes, but the roof must be surveyed first. Fragile or asbestos-cement roofs may need repair, over-cladding or replacement before panels are fitted, or a ground-mounted or carport system may be a better choice.

Can I get industrial solar with no upfront cost?

Yes, through an on-site power purchase agreement (PPA) or some leasing arrangements, where a funder owns the system and you pay for the electricity or a fixed fee. You save less than buying outright, but avoid capital outlay.

Free feasibility review

Request your free feasibility review

Share a few details and our team will send a no-obligation review of your site - indicative system size, annual generation, savings and payback. Prefer to explore numbers yourself first? Run the calculator or contact us directly.

  • MCS & RECC accredited installer
  • Response within one working day
  • No cost, no obligation
Try the calculator

By submitting you agree to be contacted about your enquiry. We don't share your details.

Ready to see whether your roof could reduce your energy bills?