Guide · Buyer

How to choose a commercial solar installer in the UK

A commercial solar system is a 25-year decision — but the installer typically only stays around for 10. Here's the 12-point checklist to separate the specialists from the sales operations.

The 12-point checklist

  1. MCS certification for the exact system size band you're buying.
  2. RECC or equivalent consumer/commercial code membership.
  3. Public liability insurance to at least £5m and employer's liability to £10m.
  4. NICEIC or NAPIT electrical accreditation for the AC side.
  5. Working-at-heights and CSCS/CISRS scaffold competencies for the install team.
  6. Positive Companies House filings — 3+ years trading, no CCJs, growing turnover.
  7. Reference sites of similar scale (kWp) in the same sector — request three.
  8. Written workmanship warranty of 10 years minimum, on top of panel/inverter warranties.
  9. Named O&M plan with 24-hour response SLA and remote monitoring included.
  10. DNO application handled in-house, not subbed out.
  11. Independent commissioning report to G99 standards, not just installer sign-off.
  12. Clear, fixed-price quote — no 'subject to survey' variables above 5%.

Questions to ask on the site visit

  • Who is the named project manager and what's their solar-specific experience?
  • How many kWp have you installed in the last 12 months at this size?
  • Is the DNO application handled in-house or sub-contracted?
  • What happens in year 8 if the inverter fails and the OEM has folded?
  • Show me a real O&M report from a similar client.

Related reading

FAQ

How do I know a commercial solar installer is legitimate?

Check MCS certification (mcscertified.com), RECC membership, Companies House trading history (3+ years, growing turnover), and ask for three reference sites at similar scale in the last 24 months. Legitimate installers list all of this openly.

What warranties should a commercial solar installer offer?

A minimum of: 25-year panel performance warranty, 10–12 year inverter warranty (or extendable), and a 10-year workmanship warranty on the installation itself. Anything shorter than 5 years on workmanship is a red flag.

Do commercial solar installers need MCS?

MCS is required for systems that will claim Smart Export Guarantee payments and is expected by insurers and lenders. Some very large (>1 MW) projects use equivalent international standards — that's fine, but for UK commercial rooftop MCS is the norm.

How many quotes should I get for commercial solar?

Three from qualified installers is the sweet spot. Fewer and you can't triangulate price; more and the process becomes unmanageable. Ask each to quote on the same specification so numbers are comparable.

What's a red flag when choosing a commercial solar installer?

Any of: no reference sites, no in-house electrical team, refusing to name the panel/inverter brand until you sign, upfront deposits above 10%, workmanship warranty under 5 years, or pressure to close within 48 hours.

See how we score on the checklist

Ready to see whether your roof could reduce your energy bills?