Guide · Export

Smart Export Guarantee for UK businesses — 2026

SEG pays commercial solar owners for every kWh they export to the grid. Rates run from 4p to 18p/kWh depending on tariff — here's how to pick the right one and when a PPA is a better route.

Leading SEG tariffs in 2026

Octopus Outgoing Fixed

~15p/kWh flat. One of the best fixed rates for commercial systems under 5 MW.

Octopus Outgoing Agile

Tracks half-hourly wholesale — can average 12–18p/kWh but requires a smart meter and shifts risk to the exporter.

E.ON Next Export Exclusive

~16.5p/kWh for E.ON supply customers only. Solid mid-market option.

British Gas Export & Earn Flex

6.4p/kWh — lower headline rate but no supply-tie requirement.

Rates change often — check with each supplier before signing. Systems above 5 MW need a PPA route to market.

What's needed to claim SEG

  • MCS or equivalent certificate for the install.
  • Half-hourly (SMETS2) export-capable smart meter.
  • MPAN and metering details for the site.
  • System size at or below 5 MW.

Related reading

FAQ

Can businesses claim the Smart Export Guarantee?

Yes. Any solar system up to 5 MW installed by an MCS-certified installer can register for SEG. Above 5 MW you sell through a PPA or the wholesale market rather than SEG.

What's the best SEG tariff for a business in 2026?

Octopus Outgoing Fixed at around 15p/kWh is currently the best broad-market SEG rate. E.ON Next Export Exclusive is competitive if you're already an E.ON business supply customer. Rates change frequently — check before signing.

Do I need a smart meter for SEG?

Yes — SEG requires a half-hourly export-capable smart meter (SMETS2). Most UK commercial supplies now have this; if not, your supplier will install one before SEG payments start.

Is SEG better than a PPA for large systems?

For arrays up to a few hundred kWp, SEG usually wins on simplicity and no long-term contract. Above 500 kWp and especially over 1 MW, a corporate PPA or route-to-market agreement typically achieves higher realised export prices and can add merchant floor pricing.

How do I register for SEG?

Get your MCS certificate from the installer, your MPAN and meter details, then apply directly with the SEG licensee of your choice — you can choose any, regardless of who supplies your import electricity. Registration typically takes 2–4 weeks.