Answer

Can I install solar panels on a leased commercial building?

Yes — solar can be installed on a leased UK commercial building, provided the landlord gives written consent, usually through a licence for alterations plus a roof licence or lease variation. The three normal routes are tenant-funded, landlord-funded with cost recovery, or a third-party PPA. A remaining lease term of at least seven years makes a tenant-funded system far easier to justify.

Last updated 18 September 2026.

Key facts at a glance

Landlord consentRequired — licence for alterations, plus roof licence
Workable lease term (tenant-funded)7+ years remaining
Short lease alternativePPA or landlord-funded install
Who keeps the savingsWhoever buys the electricity on site
Landlord benefitBetter EPC, MEES compliance, letting appeal
End of termAgree removal, handover or transfer up front

The three routes that work in practice

Tenant-funded: you pay, you own it, you keep the savings, and the lease documents what happens at expiry. Landlord-funded: the landlord pays and recovers through rent, a service charge or a green lease clause, which suits short tenancies and multi-let estates. Third-party PPA: a funder owns the system and sells you the electricity at a fixed rate, removing capex and usually the ownership argument with it.

What to settle before design starts

Six points decide whether a leasehold project runs smoothly: roof access and structural responsibility, who owns the equipment, who keeps generation savings and export income, insurance and maintenance obligations, rights of access for the installer and O&M team, and the end-of-term position — removal, handover at nil value, or purchase. Agreeing these in principle before survey saves weeks later.

  • Check the lease for alteration, alienation and roof rights
  • Confirm remaining term and any break clauses
  • Establish whose meter the generation feeds
  • Record consent in writing before ordering equipment

Related reading

FAQ

Can a landlord refuse solar panels?

Yes, unless the lease says otherwise. Most refusals come from concerns about roof warranty, structural loading and reinstatement — all of which a structural report and a clear reinstatement clause usually resolve.

What if my lease has under five years left?

A tenant-funded purchase rarely pays back in time. A PPA or a landlord-funded system with a rent adjustment is normally the better structure.

Free feasibility review

Request your free feasibility review

Share a few details and our team will send a no-obligation review of your site — indicative system size, annual generation, savings and payback. Prefer to explore numbers yourself first? Run the calculator or contact us directly.

  • MCS & RECC accredited installer
  • Response within one working day
  • No cost, no obligation
Try the calculator

By submitting you agree to be contacted about your enquiry. We don't share your details.